Penwith HA changed their profile picture 4 months, 1 week ago
-
Penwith HA wrote a new post, HeatPod Project Wins Two Awards, on the site Penwith HA HeatPod 4 months, 1 week ago
-
Penwith HA wrote a new post, Official launch of HeatPod Project, on the site Penwith HA HeatPod 4 months, 1 week ago
-
Penwith HA wrote a new post, Work On Site Complete, on the site Penwith HA HeatPod 6 months, 2 weeks ago
-
Penwith HA wrote a new blog post: Pellet Stove Commissioned 9 months ago
The wood pellet stove has been installed and commissioned by the Stove Shop (based in Liskeard,Cornwall). The stove is a Caminetti ‘Linea Pellet 6’ model with a nominal thermal output of 6kW which can reduce to 1.8 kW – the latter being more suitable for such a well insulated house. The unit is fully automated and [...] -
Penwith HA wrote a new blog post: Loft Insulation 9 months ago
-
Penwith HA wrote a new blog post: Ground / Air / Solar Source Heat Pump operational 9 months ago
-
Penwith HA wrote a new blog post: HeatPod Installed 10 months, 1 week ago
Installation of the conservatory was carried out on 7 th & 8 th July by the Causeway Trading Group Ltd. (CTG) who built this unit for the project. The installation was quickly and expertly carried out and the quality of the manufacture is first class – it promises to fulfil its role perfectly. It has been described as the [...] -
Penwith HA wrote a new blog post: Dealing with cold bridging – Finlock Gutters 10 months, 3 weeks ago
Our retrofit property is fitted with Finlock Gutters – a proprietary reinforced concrete combined gutter and cavity closer that was very widely used in post war local authority housing. Although it was of no consequence in the days when they were designed, they provide a very substantial cold bridge across the external wall. As there was [...] -
Penwith HA wrote a new blog post: Finishing External Wall Insulation 10 months, 3 weeks ago
Following fixing of the insulation boards they are consolidated with a layer of glass fibre reinforcing mesh bedded in a coat of reinforcing mortar. Stop beads are fitted where required to form neat edges to the final render coat. Following completion of the reinforcing layer the final decorative top coat of render is applied. In this [...] -
Penwith HA wrote a new blog post: Starting External Wall Insulation 11 months, 2 weeks ago
Work has started on fixing the external wall insulation. The 100mm thick phenolic boards will provide the external walls with a ‘u’ value of 0.16 W/m2K and form an airtight seal against the new doors and windows when the render system is applied. The system used is manufactured by Knauf Marmorit and is being installed by their Truro based [...] -
Penwith HA wrote a new blog post: Final preparations for fixing external wall insulation 12 months ago
The house is now ready for fixing the external wall insulation. All of the new windows and doors have been installed. The new doors are by Homesafe and include their ‘Eco Packs 1 & 2’ providing added air tightness and a ‘u’ value of 1.2 W/m2K – in addition to a Secured By Design accreditation. The [...] -
Penwith HA wrote a new blog post: Installing new windows 1 year, 1 month ago
Week beginning 11 th April – work started on replacing the existing windows with new Jeld-Wen ‘DreamVu’ all timber triple glazed units. These are high performance windows with a ‘u’ value 0.7 W/m2K. As can be seen in the photo, the windows are positioned with the frame overlapping the outer face of the external wall. This [...] -
Penwith HA wrote a new blog post: PV System Installed 1 year, 1 month ago
The PV system was expertly fitted by local installer Plug Into The Sun. It is a 1.15 kW solar PV system using Moser Baer MBPV 230 (1661 x 991 mm) modules mounted using the Alpha Mounting System and linked to a SMA Sunny Boy SB1200 inverter. The PV system is not intended to meet all of [...] -
Penwith HA wrote a new blog post: Wood Pellet Room Heater Delivered 1 year, 1 month ago
The wood pellet room heater was delivered to the site on 31 st March by the Stove Shop from Liskeard in Cornwall. The room heater is a Caminetti Linea Pellet 6 unit made in Italy. It is a completely room sealed device which takes its combustion air from the external air via a duct to be installed [...] -
Penwith HA wrote a new blog post: Project week 3 1 year, 1 month ago
Project week 3 – work progressing very well. The HeatPod base walls are now completed and ready for casting the floor slab. The soil & vent pipe has been relocated inside the house in order to simplify fixing of external wall insulation. Preparation of the external walls to receive the insulation is under way including relocation [...] -
Penwith HA wrote a new blog post: Foundations laid for the HeatPod base ready for construction 1 year, 1 month ago
Project week 2 – foundations laid for the HeatPod base ready for construction of the substructure. This will include a concrete floor slab surrounded by insulation which will provide an element of passive thermal storage. The external soil & vent pipe visible in the photo will be replaced with an internal system in order to [...] -
Penwith HA wrote a new blog post: Mears Limited begin work on site 1 year, 2 months ago
14 March 2011 – Work started on site with a new main contractor Mears Limited who have a very capable and enthusiastic team assigned to the project. The first items of work to be carried out include removal of the existing concrete porch canopy (see photo) and then excavating the area to be occupied by [...] -
Penwith HA wrote a new blog post: Ground Source Heat Pump Borehole 1 year, 2 months ago
Despite not having a main contractor on site it was possible to arrange for the ground source heat pump borehole to be drilled during November 2010. This was carried out successfully by GSHP specialist contractor EarthEnergy with only minimal disturbance of the garden. A 60m borehole was drilled and groundloops inserted and grouted ready for [...] -
penwithhousingpenzance wrote a new blog post: HeatPod project delayed by Rok entering administration 1 year, 4 months ago
Just a week after starting work on site, our main contractor Rok fell victim to the recession and entered administration. It was a frustrating moment as team at Rok were enthusiastic and well prepared to carry out the work. Fortunately, despite the demise of Rok, our team of specialist sub-contractors were all still available to [...]